At an activity level of 9,800 machine hours in a month, Nooner Corporation's total variable production engineering cost is $888,860 and its total fixed production engineering cost is $254,430. What would be the total production engineering cost per unit, both fixed and variable, at an activity level of 9,900 machine hours in a month? Assume that this level of activity is within the relevant range.

Break-even Point:

In management accounting, the concept of break-even point is significant in analyzing how many units must be produced so that the company can have a profitable business operation.

Answer and Explanation: 1

Become a Study.com member to unlock this answer!

View this answer

Before we answer the above problem, always remember that in a relevant range the following is constant.

  • Total fixed costs remain the same regardless...

See full answer below.


Learn more about this topic:

Loading...
How to Calculate the Break-Even Point - Definition & Formula

from

Chapter 5 / Lesson 28
159K

See how to calculate break-even point (in units and dollars). See the variables of the break-even point formula and examples. Understand the purpose of break-even analysis.


Related to this Question

Explore our homework questions and answers library